Project Highlights

Project Overview

This project was awarded to Schouten for the complete package providing interior selective demolition, hazardous materials abate- ment and complete infection control measures for all phases in the project cycle

Project Scope:

Infection control, Demolition ,hazardous materials abatement throughout (2) Wings of the St Mary’s. Abatement included asbestos removal types I-III, removing flooring, plaster, and friable piping in- sulation throughout walls and mechanical chases. Infection control measures were installed outside of abatement measures as per IPAC control and measures on construction sites for all areas of construc- tion and demolition activities.