Project Overview
Complete abatement and dismantling of (2) two industrial boilers with in an
active industrial site using Type III methods complete with system scaffolding
erected around the entire boiler
Project Scope:
The complete abatement, dismantling and salvaging of (2) exist-
ing foster wheeler boilers within an active plant using Type III
measures. Schouten provided complete enclosures using sys-
tem scaffold around the boilers to create a negative pressure se-
cure environment during abatement of insulation and refractory
brick while systematically hot cutting the tubing systems and
boiler structure. Selective demolition of the existing house keep-
ing pads was complete for Boiler #1 and salvaging the main
boiler plate of Boiler #2 was completed with success