CMH BRIDGE & RESIDENCES | WATERLOO ON

CMH BRIDGE & RESIDENCES | WATERLOO ON

Services Provided: Demolition, Environmental, Excavation

Project Highlights

Project Overview

This project was tendered out by University of Waterloo to de- molish the existing student throughout bridge over University Ave in preparation for a connecting bridge from the newly built residence building

Project Scope:

The complete demolition of the existing CMH vestibule and connection the to existing university breezeway. Helical pile and heavy bracing was installed while Schouten selectively saw cut and separate the vestibule from the main tunnel positioned over University’s active roadway. Additional demolition of E3 front fa- çade and footings to provided a clear path for new works and new residence building to be erected.