Project Overview
This project was awarded to Schouten Environmental to provided
remediation services throughout this 60,000sqft secondary school
Project Scope:
Schouten was awarded the abatement and various selective demolition
components of the project. Hazardous Abatement using Type 3 measures
to safely removed existing fire-spray within block walls and concealed areas
throughout the school. Type 3 removal of 12,000 sqft of atrium plaster
finishes using engineered scaffold was conducted as major milestone of the
project. Hazardous materials removal spanned the course of 7-8 months
with the oversight a Pinchin Ltd as a third-party environmental consultant.