Project Overview

Schouten Excavating completed heavy civil, site servicing, and under- ground infrastructure works for the expansion of the Denis St. Pierre Water Pollution Control Plant. The scope included site preparation, demolition of existing infrastructure, bulk and structural excavation, and installation of underground utilities.

Project Scope:

Due to the dense underground infrastructure and integration with new plant structures, the work required precise excavation, grading, and installation of process piping, structural foundations, and utility corridors. Schouten executed the underground and site works with careful coordination between civil, structural, and mechanical trades to ensure accurate alignment of piping systems, proper trench preparation, and engineered backfilling to support long-term plant operations. All work was completed within an active treatment plant environment, requiring strict safety controls and coordination with ongoing plant operations. Various auxiliary building were demolished to make way for excavation and new piping and services to support the new control plant

DISCUSS YOUR PROJECT

Call Us
226.678.4715
Visit Us
7908 Jariot St Watford, ON N0M 2S0